Hotel-Online and BuildCentral Add/Update 139 Hotel Projects to the New Hotel Construction Projects Database

Chicago, IL. July 1, 2013 – Hotel-Online and BuildCentral have added or updated 139 hotel projects in the last two weeks to Hotel Construction, a nationwide database of hotel construction projects, openings, and key decision makers (Owner/Developers, Architects and Contractors).

These proposed hotels are still in the planning stages. Now is the perfect time to have your product drawn into plans, or offer construction services:

These new hotels will open within the next few months. If you offer a service for the hospitality industry, key contacts at these properties will want to hear your sales pitch now:

Each report provides a detailed profile of the project, including construction schedule, date of the hotel’s opening and operation, location, value, name of chain and franchise, number of rooms, latest developments, and key contacts. Service providers and products suppliers use this information to gain access to decision makers at the precise time they are most likely making their purchasing decisions.

New project reports and lists of projects with upcoming construction start dates and opening dates are added to the database daily. Subscriptions start at only $399 per year. For more information or a free trial, visit http://hotels.buildcentral.com.

Sample Project Details

Fifth and Columbia Tower, SBE Hotel

Project Information

Project Type: Hotels/Motels/Resorts; Restaurants; Retail (Shops/Restaurants)

Estimated Value: $25-100 million

Sector: Private

Location: 811 5th Avenue, at Columbia, Seattle, WA 98104.

Construction Schedule: Planning and Approval

Details: Plans call for construction of a 184-room luxury hotel as part of the Fifth and Columbia Tower. The hotel, which will include two restaurants, will be on floors two through 15 of the 43-story building and will have more than 175,000 square feet.

Chain: Independent – Luxury

Franchise: Independent

Scale: Luxury

Rooms: 184

Contact Information

Property Manager

SBE

Sam Nazarian, Principal

8000 Beverly Boulevard

Los Angeles, CA 90048

PH: 323-655-8000

FAX: 323-655-8001

Email: [email protected]

http://www.sbe.com

General Contractor

GLY Construction Inc.

200 112th Avenue Northeast

Suite 300

Bellevue, WA 98004

PH: 425-451-8877

FAX: 425-453-5680

http://www.gly.com

Architect

Zimmer Gunsul Frasca Architects (ZGF)

John Chau, Project Manager

925 Fourth Avenue

Suite 2400

Seattle, WA 98104

PH: 206-623-9414

FAX: 206-623-7868

Email: [email protected]

http://www.zgf.com

Developer

Daniels Development Company

Kevin Daniels, President

2401 Utah Avenue South

Suite 305

Seattle, WA 98134

PH: 206-467-0420

Email: [email protected]

http://www.danielsdevelopmentcompany.com

Developer

Stockbridge Capital Group

4 Embarcadero Center

Suite 3300

San Francisco, CA 94111

PH: 415-658-3300

FAX: 415-399-1926

http://www.sbfund.com

Project News & Notes

June 20, 2013

On 6/20/13, a representative from Daniels Development Company confirmed that French architect, Philippe Stark, will be the interior designer for the SLS hotel and restaurants in the tower, and GLY Construction Inc. will be the general contractor. The project is slightly behind the original schedule to begin in the fall of this year, 2013, and they are unable to estimate when construction will actually begin at this time. A representative from the city of Seattle (WA) stated that a request for an extension to the permit review process to 9/8/14 was approved in March 2013, by the planning department.

February 14, 2013

Daniels Development Company is still working on getting financing for the tower. SBE will operate the hotel.

February 1, 2013

As of 2/1/13, the developers have filed a permit application to change the plans for the project and add a hotel. A permit was issued for the project in 2008, but development stalled due to the economy.